   1. Carry out the test run according to the test run plan or operating procedures. The pump body should be preheated before the test run. When the pump body temperature reaches the working temperature, the manual cranking should be flexible.


  2. After the pump runs at full load, check the following operating conditions:

  (1) Whether the power, voltage and current of the motor are normal;

   (2) Whether the sound of the unit is normal;

  (3) Measure the pump inlet and outlet pressure and flow;

  (4) Check whether the mechanical seal is leaking;

  (5) Check whether the temperature of the rolling bearing is normal;

  (6) Use a vibration meter to check the vibration of the motor and pump body.

 

  3. After 6~10min of trial operation, if no fault is found and the parameter index can be reached, the machine can stop.

Related Pump Knowledge
More Pump Knowledge
19 Jan 2026
      As a core fluid transfer equipment, the single-stage double-suction split case centrifugal pump is widely used in water conservan...
Read more
12 Jan 2026
      In industrial fluid transfer applications, the stable operation of multistage pumps is of critical importance. However, in practi...
Read more
05 Jan 2026
         Centrifugal pumps are widely used in industrial fluid transportation systems. However, water pressure fluctuations d...
Read more
29 Dec 2025
         Self-balancing multistage pumps, as innovative products in the field of multistage centrifugal pumps, achieve breakthroughs in structural des...
Read more
Related Products
More
Split Case Pump
Split Case Pump
  • Capacity:60-33005m³/h
  • Head:0.95-30.2bar
  • Price:$2200-215000
Double Suction Pump
Double Suction Pump
  • Capacity:60-33005m³/h
  • Head:0.95-30.2bar
  • Price:$2200-215000
Single Stage Chemical Pump
Single Stage Chemical Pump
  • Capacity:5.5-2600m³/h
  • Head:1.6-25bar
  • Price:$4300-37000
End Suction Chemical Pump
End Suction Chemical Pump
  • Capacity:5.5~400m³/h
  • Head:0.42-12.5bar
  • Price:$560-9800
Need More Information?
Contact us for more details about our pump, solutions and services.
Contact ZB
Tel
0086 731 88192011
Email
Chat online
Leave a message
Name*
Tel
Email*
Area
Products
Split Case Pump
Metallurgy
Mining Industry
Urban Water Supply
Petrochemical
Light Industry
Electricity
Chemical Industry
Farmland Irrigation
Other
Provide your comments and questions.