The failure of high-lift sewage pump without water and its countermeasures

19 Dec 2020Email

The failure of high-lift sewage pump without water and its countermeasures

 

 

   1. The high-lift sewage pump does not discharge water after starting: there is air in the pump or the gas in the water inlet pipe, or the bottom valve is not closed tightly.

 

The failure of high-lift sewage pump without water and its countermeasures

 

Countermeasures: remove debris, replace the damaged rubber pad, change the direction of the valve; press tightly or replace the new packing, close the gate valve or tap the door; increase the filling volume until the vent screw plug does not bubble; replace Cracked pipe; reduce the head, press the nozzle of the high-lift sewage pump into the water 0.5 meters.

 

  2. The high-lift sewage pump does not rotate when starting: the packing is too tight or the impeller and the pump body are stuck and blocked by debris, or the pump shaft, bearing, or leakage reduction ring is rusted, or the pump shaft is severely bent.

 

   Countermeasures: loosen the packing, dredge the water channel; disassemble the pump body to remove debris and rust; remove the pump shaft for correction or replace with a new pump shaft.

 

  1. The heating bearing of high-lift sewage pump is damaged: the clearance of rolling bearing or bracket cover is too small; the pump shaft is bent or the two shafts are not concentric; the tape is too tight; the oil is lacking or the oil quality is not good; the balance hole on the impeller is blocked and the impeller loses balance , Increase the thrust to one side.

 

Countermeasures: replace the bearing; remove the rear cover, install a gasket between the bracket and the bearing seat; adjust the pump shaft or adjust the concentricity of the two shafts; adjust the tightness of the tape appropriately; add clean butter, and the butter occupies the bearing 60% of the gap; clear the blockage in the balance hole.

 

  1. Insufficient flow after starting: the speed is not matched or the belt is slipping, which makes the speed low; the blade installation angle of the axial flow pump is too small; the lift is insufficient; the suction is high; the bottom valve, pipeline and impeller are partially blocked or the impeller is defective; The water pipe is leaking seriously.

 

Countermeasures: adjust the blade angle, reduce the installation height of the vertical sewage pump; restore the rated speed, remove the belt grease, adjust the belt tightness; seal the leak of the vertical sewage pump, press the packing; remove the blockage, replace the impeller; replace The leak-reducing ring blocks the leaking place.

Related Pump Knowledge
More Pump Knowledge
20 May 2026
      In the production operations of the salt chemical industry, process media generally contain high-concentration salts such as sodi...
Read more
09 May 2026
      Many people wonder why multistage pump impellers are prone to damage—often, it’s not an equipment issue. The core rea...
Read more
02 May 2026
     High-pressure boiler feed pumps are mostly horizontal multistage centrifugal pumps. Their core working principle is to generate centrifugal force...
Read more
22 Apr 2026
      Both single-stage pumps and multi-stage pumps belong to the centrifugal pump family. Their core difference stems from the impelle...
Read more
Related Products
More
Split Case Pump
Split Case Pump
  • Capacity:60-33005m³/h
  • Head:0.95-30.2bar
  • Price:$2200-215000
Double Suction Pump
Double Suction Pump
  • Capacity:60-33005m³/h
  • Head:0.95-30.2bar
  • Price:$2200-215000
Single Stage Chemical Pump
Single Stage Chemical Pump
  • Capacity:5.5-2600m³/h
  • Head:1.6-25bar
  • Price:$4300-37000
End Suction Chemical Pump
End Suction Chemical Pump
  • Capacity:5.5~400m³/h
  • Head:0.42-12.5bar
  • Price:$560-9800
Need More Information?
Contact us for more details about our pump, solutions and services.
Contact ZB
Tel
0086 731 88192011
Email
Chat online
Leave a message
Name*
Tel
Email*
Area
Products
Split Case Pump
Metallurgy
Mining Industry
Urban Water Supply
Petrochemical
Light Industry
Electricity
Chemical Industry
Farmland Irrigation
Other
Provide your comments and questions.