EN CN
Home / Services / Pump Encyclopedia / Pump Knowledge / The details that should be paid attention to when starting the mining multi-stage pump

The details that should be paid attention to when starting the mining multi-stage pump

12 Nov 2020Email

The details that should be paid attention to when starting the mining multi-stage pump

 

 

Multi-stage pump for mining

What details should be paid attention to when starting the pump   
(1) Check electrical equipment, instrumentation and knife switches according to operating regulations.  
(2) Check whether the motor is in good condition and measure the motor insulation resistance.  
(3) Check whether the fixing bolts at various parts are loose or missing, check whether there is any sundries around the stainless steel centrifugal pump that hinder the start-up operation, and check whether the motor is grounded firmly.  
(4) Check whether the rotation of the motor is consistent with the rotation of the pump.  
(5) Check whether the inlet and outlet valves are flexible and easy to use, and open the inlet valve, close the outlet valve, check whether the pump seal packing leaks, and open the vent valve to confirm that the pump is filled with water and air is drained before closing the vent valve .  
(6) Disc pump 3 to 5 turns, check whether the pump and motor rotate flexibly, listen for noise, use a crowbar to move the pump back and forth to check whether the pump displacement is qualified.  
(7) Check whether the coupling is intact, whether the shield is firm, and whether there is any deflection.  
(8) Check whether the liquid level of the large tank meets the requirements for starting the pump.  
(9) Water injection stations and large-scale oil delivery stations should check the lubricating oil equipment and cooling water system and adjust them to normal working conditions.  
(10) After everything is ready, contact the relevant department (post) to prepare to start the multi-stage pump for mining.

Related Pump Knowledge
More Pump Knowledge
04 May 2024
           There is a close relationship between the flow, head and efficiency of the pump, which together determine the...
Read more
27 Apr 2024
            When the O-ring of the multistage pump is damaged or aged, it needs to be replaced in time to ensure the nor...
Read more
20 Apr 2024
           Multistage centrifugal pump vs single-stage centrifugal pump: Which is more efficient? For this problem, the centrifugal pump professional ...
Read more
13 Apr 2024
            Centrifugal pump and axial flow pump are two commonly used pump classes, they have a wide range of applications in industry. Although they...
Read more
Related Products
More
Split Case Pump
Split Case Pump
  • Capacity:60-33005m³/h
  • Head:0.95-30.2bar
  • Price:$2200-215000
Double Suction Pump
Double Suction Pump
  • Capacity:60-33005m³/h
  • Head:0.95-30.2bar
  • Price:$2200-215000
Single Stage Chemical Pump
Single Stage Chemical Pump
  • Capacity:5.5-2600m³/h
  • Head:1.6-25bar
  • Price:$4300-37000
End Suction Chemical Pump
End Suction Chemical Pump
  • Capacity:5.5~400m³/h
  • Head:0.42-12.5bar
  • Price:$560-9800
Need More Information?
Contact us for more details about our pump, solutions and services.
Contact ZB
Tel
0086 731 88192011
Leave a message
Name*
Tel
Email*
Area
Products
Split Case Pump
Metallurgy
Mining Industry
Urban Water Supply
Petrochemical
Light Industry
Electricity
Chemical Industry
Farmland Irrigation
Other
Provide your comments and questions.