Maintenance of feed pump parts for multi-stage high pressure boilers

19 Mar 2021Email

Multi-stage high-pressure boiler feed water pumps are often used for high-lift water delivery in factories and cities. The main parts of multi-stage high pressure boiler feed water pump include shaft, sleeve, inlet section, impeller, sealing ring, middle section, outlet section, balance ring, balance plate, and tail cover. If a part of the water pump fails during use, it will affect the use, so how should the parts of the multi-stage high-pressure boiler feed water pump be overhauled?

(1) Multi-stage high pressure boiler feed water pump balance device

Check the balance plate and the balance plate for axial wear marks and scratches. If there are, the two worn surfaces should be slightly trimmed on the lathe. For deep scars or severe partial wear, if they are repaired and reused, it is guaranteed The alignment between the inlet of the guide vane and the center of the outlet of the impeller should be adjusted by trimming the length of the toothed pad (from the flat end surface). If it cannot be guaranteed, the wearing parts should be replaced;

Check the balance cover and the balance plate for axial wear marks or scratches. If so, the two worn surfaces should be slightly trimmed on the lathe. For deep scars or severe partial wear, re-use after trimming. In order to ensure the alignment of the guide vane inlet and the center of the impeller outlet, the length of the toothed pad should be adjusted (from the flat end surface) to adjust, and the wearing parts should be replaced if it cannot be guaranteed;

Check the balance sleeve and balance sleeve for radial wear marks. If so, the worn surface should be slightly trimmed on the lathe, and the radial clearance should be controlled within the allowable deviation range (less than 0.25mm). ), if this value exceeds the stipulation, these two pieces should be replaced.

(2) Multi-stage high pressure boiler feed water pump shaft

Check the maximum runout tolerance of the shaft (ie, shaft bending). In principle, if the runout of the shaft exceeds the allowable tolerance, it is never allowed to use the hot and cold method to straighten it, and a new shaft should be replaced.

During the inspection, the axle bracket can be carried out between the two centers of the lathe (you can also use the V-shaped iron to support the supporting parts to detect the beating). But note that the axle should be accurately centered on the lathe, otherwise errors will occur.

(3) Multi-stage high-pressure boiler feed water pump hydraulic components and inter-stage sealing components

Check whether there are cracks or grinding on the sealing surfaces of the middle section, guide vanes, impellers, middle seal rings, front seal rings and guide vane sleeves;

Use a dial indicator to measure four points on the circumference of the sealing surface to check the parallelism. The deviation of the guide vane and the middle section must not exceed 0.03mm, and the other deviations must not exceed 0.01mm. If there are scars on the sealing surface, it is best to repair it on a lathe. If the sealing surface can be trimmed on a lathe, it can be ground and trimmed with a grinding tool. The mating surface must not be used as a ground tire to grind the sealing surface, because this will cause the spout to expand.

Check the radial clearance of the seal ring and the guide vane sleeve. If the measured gap value exceeds the maximum allowable value, replace the new components (remove the spot welding points on the guide vane and the middle section, and remove the old guide vane (Sleeve and front seal ring), respectively inspect the wheel shell and neck of each impeller, check whether there is abrasion, and then trim the contour and neck from the second stage to the last stage.

(4) Multi-stage high pressure boiler feed water pump bearings

Check the bearing bush, if there are cracks, delamination, pores and severe wear, if necessary, scrape off the slight indentation with a scraper.

The contact angle between the journal and the lower shoe is 60+5°, and it should be in the middle of the shoe, and the contact should be even.

(5) Multi-stage high pressure boiler feed water pump shaft seal

Damaged shaft sleeves and sealing elements should be replaced with new ones. If there are slight scratches or grooves on the surface of the shaft sleeve, they should be repaired.

(6) Rotor parts of multi-stage high pressure boiler feed water pump

After the rotor parts are repaired or replaced, it is necessary to re-install the test assembly (the "O" seal ring is not necessary for the test assembly), and then measure the radial runout of the hole in the guide vane sleeve of the outer diameter of the impeller seal ring, and balance the runout value of the end face of the disc to make Do not exceed the specified tolerance (<0.06mm). Perform a dynamic balance test on the rotor, and the allowable unbalanced torque M is shown in the following table:

allowable unbalanced torque M

Related Pump Knowledge
More Pump Knowledge
02 May 2025
             With the rapid advancement of industrial development, multistage centrifugal pumps are increasingly wi...
Read more
25 Apr 2025
          There could be many reasons why a horizontal double-suction centrifugal pump fails to draw water. The following are...
Read more
17 Apr 2025
            In the modern industrial equipment system, multistage centrifugal pumps, as core fluid transfer devices, are...
Read more
09 Apr 2025
          In the mining industry, one of the pumps frequently used in mines is the slurry pump. This is a type of pump capabl...
Read more
Related Products
More
Split Case Pump
Split Case Pump
  • Capacity:60-33005m³/h
  • Head:0.95-30.2bar
  • Price:$2200-215000
Double Suction Pump
Double Suction Pump
  • Capacity:60-33005m³/h
  • Head:0.95-30.2bar
  • Price:$2200-215000
Single Stage Chemical Pump
Single Stage Chemical Pump
  • Capacity:5.5-2600m³/h
  • Head:1.6-25bar
  • Price:$4300-37000
End Suction Chemical Pump
End Suction Chemical Pump
  • Capacity:5.5~400m³/h
  • Head:0.42-12.5bar
  • Price:$560-9800
Need More Information?
Contact us for more details about our pump, solutions and services.
Contact ZB
Tel
0086 731 88192011
Email
Chat online
Leave a message
Name*
Tel
Email*
Area
Products
Split Case Pump
Metallurgy
Mining Industry
Urban Water Supply
Petrochemical
Light Industry
Electricity
Chemical Industry
Farmland Irrigation
Other
Provide your comments and questions.