Installation and use of deep well submersible pumps

13 Jun 2019Email

1. Acceptance of deep well submersible pump: When the user picks up the goods from the logistics company, it should be carefully checked to see if the cable sheath is damaged. Whether the pump is broken or not.

2. Loading and unloading: Care should be taken to load and unload the truck so as not to damage the concentricity of the unit or break the cable insulation.

3. Checking steps before the whole unit goes down the well:

A. Disassemble the filter screen and use the mast to move the coupling.

B. Fill the electric pump vertically with water, connect the cable joints, soak the joints in the water basin, and shake the joint resistance to ground (the insulation resistance of the single-finger joint to water) is not less than 500 megohms.

C. Put the pump in the appropriate container and add the washing powder to the outlet of the pump. At the same time, slightly click the motor start button to observe the steering of the pump carefully. The time should not exceed 2 seconds.

4. Steps for on-site assembly of the pump when it is transported separately:

A. Install the motor vertically before installation, open the venting hole and the water injection hole. Be sure to open both water plugs. Fill the water to close the water plug and the water plug. Observe the motor for water leakage. If there is water leakage. Do not go down the well, the reason may be the bumper in the transportation process, should be promptly contacted by the agent or the manufacturer to resolve, until it does not leak (observe 10 to 15 minutes). Then shake the insulation resistance of the motor, the value is not less than 50 megohms.

B. Wrap the cable connector. After wrapping, try the steering of the motor. The direction of the arrow marked on the pump is the same, and the mark is consistent.

5. Inspection of the pump when the deep well submersible pump is separated

A. Remove the upper casing of the pump to expose the uppermost impeller.

B. Turn the impeller by hand to see if it is flexible.

C. Pull the impeller in the direction of the pump shaft to observe the total amount of the impeller. (General QJ pump 4-6 mm)

D. Install the coupling and the motor in one piece so that the motor shaft head and the pump head are not tight enough to have a gap.

E. Look at the upper and lower enthalpy gaps of the impeller, which should be in the middle of the total enthalpy (permissible deviation ± 0.5 mm).

F. When the deviation is greater than 0.5 mm, adjust the adjustment pad to the middle position. The hand should be rotated flexibly.

G. Then drill the top hole of the coupling and tighten the top wire to install the upper case. H. Use the mast to toggle the coupling again. The rotation should be flexible for the assembly. Then install the filter and the wire box.

6. Deep well submersible pump downhole: Before the downhole, use a rope to hang a log or steel pipe of the same length (the diameter is equal to the maximum outer diameter of the unit) to test whether the well pipe is straight. In order to avoid getting stuck in the unit when the well is down. (In particular, the first time the new well is pumped down, the mine does not need this step).

7. Cable tying: The cable should be tied to the water pipe with an insulating cable tie. Do not use wire.

8. Control and start-up of the unit: selection of control equipment. Motor power × 1.2-1.4 times = control cabinet power. The control cabinet should have protection measures such as phase loss, overload, and overcurrent short circuit. After the installation of the downhole, the test machine starts. The start-up time is between 10-25 seconds according to the difference of the motor power. The start-up time of the high-power motor should be relatively long. Check whether the current is overloaded, whether the three-phase current is balanced, and make a record. And feedback manufacturers as the basis for warranty.

9. Overload, overcurrent, phase loss, short circuit, sensitivity debugging: This step is very important, please install the personnel carefully.

A. Overload and overcurrent debugging: Rotate the current adjustment knob of the thermal relay slowly to the direction smaller than the actual working current. Rotate a little scale each time, and the interval is about 2-5 minutes until the thermal relay action unit stops working. Then rotate a few scales in the opposite direction.

B. Phase loss sensitivity debugging: Start the unit again, and disconnect the fuses of the unit knife switch one by one, so that the unit is in two-phase electric working state. Observe whether the thermal relay can cut off the control power within 5 seconds.

C. Short-circuit test: This step is usually protected by the air switch of the power supply system. Generally, no field test (more dangerous) requires the power supply system to be equipped with an air switch (the air switch model is preferred DW10 type, the second choice DZ type).

 

For the above 9 items, please use the installation and commissioning personnel of the unit. The electromechanical maintenance personnel should carefully read and remember, remember! The inspection and preparation of the deep well submersible pump before going down the well

1. There should be lifting equipment that can lift the height of more than 3 meters, which can bear the whole weight of the unit (preferably with a crane), and tripod, card board, wrench, screwdriver, nipper, 500V megohmmeter, insulating rubber Self-adhesive tapes and other installation equipment.

2. Check if the installation size of the motor matches the installation size of the pump and whether the motor power is suitable.

3. Check whether the voltage and frequency of the power supply match the nameplate of the motor, and whether the parameters of the control cabinet used are matched with the motor.

4. Check whether the power cable is damaged or not. The specification is reasonable. The cable is intruded into the water for 6 hours. The insulation resistance of the ground is not less than 500 megawatts with a 500V insulation resistance meter.

Related Pump Knowledge
More Pump Knowledge
27 Apr 2024
            When the O-ring of the multistage pump is damaged or aged, it needs to be replaced in time to ensure the nor...
Read more
20 Apr 2024
           Multistage centrifugal pump vs single-stage centrifugal pump: Which is more efficient? For this problem, the centrifugal pump professional ...
Read more
13 Apr 2024
            Centrifugal pump and axial flow pump are two commonly used pump classes, they have a wide range of applications in industry. Although they...
Read more
07 Apr 2024
         The main function of the feed pump is to lift the deoxygenated water from the water tank or other water storage equipment and transport it in...
Read more
Related Products
More
Split Case Pump
Split Case Pump
  • Capacity:60-33005m³/h
  • Head:0.95-30.2bar
  • Price:$2200-215000
Double Suction Pump
Double Suction Pump
  • Capacity:60-33005m³/h
  • Head:0.95-30.2bar
  • Price:$2200-215000
Single Stage Chemical Pump
Single Stage Chemical Pump
  • Capacity:5.5-2600m³/h
  • Head:1.6-25bar
  • Price:$4300-37000
End Suction Chemical Pump
End Suction Chemical Pump
  • Capacity:5.5~400m³/h
  • Head:0.42-12.5bar
  • Price:$560-9800
Need More Information?
Contact us for more details about our pump, solutions and services.
Contact ZB
Tel
0086 731 88192011
Leave a message
Name*
Tel
Email*
Area
Products
Split Case Pump
Metallurgy
Mining Industry
Urban Water Supply
Petrochemical
Light Industry
Electricity
Chemical Industry
Farmland Irrigation
Other
Provide your comments and questions.