12 Dec 2020Email

Installation and start-up instructions for high temperature circulating pump

 

 

  How about the installation and start-up of the high temperature resistant circulating pump? Let us explain with the DG type sub-high pressure multi-stage boiler feed water pump:

 

DG type sub-high pressure multi-stage boiler feed water pump

 

   DG type high temperature resistant circulating pump installation preparation

 

   1. The installation height should be less than the allowable suction vacuum height minus the loss of the water inlet pipe. Under standard conditions, the installation height "10.3-(NPSH)r-0.5-hw, because there is a hydraulic loss in the suction pipeline;

 

  2, a pressure gauge should be installed at the pump outlet flange to observe and control the operating conditions of the pump;

 

  3. The pump should be installed in a ventilated place, and a protective cover should be added for outdoor installation to avoid sun exposure and rain;

 

 

 

  DG type high temperature resistant circulating pump installation instructions

 

DG type high temperature resistant circulating pump structure diagram

 

   1. Before installation, check whether it is deformed or damaged during transportation, and whether the fasteners are loose or fall off;

 

  2. Installation and configuration of water inlet and outlet pipes: The principle of pipeline installation should minimize the pipeline fluid resistance. A filter should be added to the pipe after the water inlet to prevent hard impurities or hard solid particles from entering the pump cavity to damage the shaft seal or water blades, causing the water pump to leak or abnormal: a check valve should be added to the water inlet pipe to facilitate Water injection;

 

  3. Wiring: It must be wired correctly according to the requirements of the nameplate. When wiring, the terminal must be firm and no looseness is allowed. Otherwise, it will cause poor contact and cause a lack of phase to burn the machine. An overload protection device must be used on the wiring line, and the setting value of the protection device must be adjusted according to the current requirements on the motor nameplate;

 

  4, press the rotation method: vertical pump;

 

  5. The suction water level is higher than the pump: single pump and double pump can be used in series or in parallel;

 

  6. ​​The suction water level is lower than the pump: such as pumping water from a pool;

 

  7, the horizontal pump directly takes over the installation;

 

 

 

   DG type high temperature resistant circulating pump starts running

 

   1. Before starting the pump, open the inlet gate valve and pump exhaust valve plug, and close the outlet gate valve. Fill the pump cavity with water so that the pump can start normally;

 

  2, jog the motor, from the motor side, check whether the steering is in the direction shown by the arrow;

 

  3. After the pump is started, gradually open the outlet gate valve and adjust to the required working condition point;

 

  4. During the operation of the pump, it is advisable that the flow at the operating point is not greater than the flow at the large flow point given in the performance reference table, and the current when the motor is running must not exceed the rated current;

 

  5. Stop sequence: close the gate valve on the outlet pipeline—motor—pressure gauge.

Related Pump Knowledge
More Pump Knowledge
25 Oct 2025
      There are multiple causes of cavitation in split case pumps, and there are also many corresponding treatment methods. The followi...
Read more
18 Oct 2025
      Self-balancing multistage pumps are widely used in various industrial scenarios due to their efficient and stable performance. Ho...
Read more
07 Oct 2025
      The petrochemical industry is a crucial pillar industry of the national economy, involving a large amount of fluid transportation...
Read more
Related Products
More
Split Case Pump
Split Case Pump
  • Capacity:60-33005m³/h
  • Head:0.95-30.2bar
  • Price:$2200-215000
Double Suction Pump
Double Suction Pump
  • Capacity:60-33005m³/h
  • Head:0.95-30.2bar
  • Price:$2200-215000
Single Stage Chemical Pump
Single Stage Chemical Pump
  • Capacity:5.5-2600m³/h
  • Head:1.6-25bar
  • Price:$4300-37000
End Suction Chemical Pump
End Suction Chemical Pump
  • Capacity:5.5~400m³/h
  • Head:0.42-12.5bar
  • Price:$560-9800
Need More Information?
Contact us for more details about our pump, solutions and services.
Contact ZB
Tel
0086 731 88192011
Email
Chat online
Leave a message
Name*
Tel
Email*
Area
Products
Split Case Pump
Metallurgy
Mining Industry
Urban Water Supply
Petrochemical
Light Industry
Electricity
Chemical Industry
Farmland Irrigation
Other
Provide your comments and questions.