EN CN
Home / Services / Pump Encyclopedia / Pump Knowledge / Crude oil pump use and maintenance

Crude oil pump use and maintenance

26 Jul 2019Email

Crude oil pump use and maintenance


       1. Before installation, ensure that the inlet and outlet pipelines are clear and unobstructed, and there must be no foreign matter such as welding slag.

 

       2. After the pump is used for the first time or after a long shutdown, the pump should be injected into the pump before starting.

 

       3. Before starting, the inlet and outlet valves are fully open. Close the exit door after shutdown

       Warning: It is strictly forbidden to start without opening the valve or stop after closing the valve first.

 

       4. Jog start to ensure that the motor rotates in the right direction and then start the pump.

 

       5. The safety valve must not be adjusted without permission before delivery or after on-site commissioning.

 

       6. At the bearing, the lubricant should be injected regularly.

       Note: The pump arrives in the user's hand and it is recommended not to disassemble the test.

Related Pump Knowledge
More Pump Knowledge
30 Mar 2026
       As a universal high-flow pump type in industrial and water conservancy fields, the double-suction split-case pump is fully ...
Read more
16 Mar 2026
      Combining equipment characteristics and practical operating experience, the clearance adjustment of the balance drum and balance ...
Read more
09 Mar 2026
     As a fluid delivery equipment widely used in industrial fields, the performance stability of multistage centrifugal pumps is criti...
Read more
28 Feb 2026
      The head of a centrifugal pump is closely related to the pressure in the pipeline, and directly affects the flow state and delive...
Read more
Related Products
More
Split Case Pump
Split Case Pump
  • Capacity:60-33005m³/h
  • Head:0.95-30.2bar
  • Price:$2200-215000
Double Suction Pump
Double Suction Pump
  • Capacity:60-33005m³/h
  • Head:0.95-30.2bar
  • Price:$2200-215000
Single Stage Chemical Pump
Single Stage Chemical Pump
  • Capacity:5.5-2600m³/h
  • Head:1.6-25bar
  • Price:$4300-37000
End Suction Chemical Pump
End Suction Chemical Pump
  • Capacity:5.5~400m³/h
  • Head:0.42-12.5bar
  • Price:$560-9800
Need More Information?
Contact us for more details about our pump, solutions and services.
Contact ZB
Tel
0086 731 88192011
Email
Chat online
Leave a message
Name*
Tel
Email*
Area
Products
Split Case Pump
Metallurgy
Mining Industry
Urban Water Supply
Petrochemical
Light Industry
Electricity
Chemical Industry
Farmland Irrigation
Other
Provide your comments and questions.