Boiler feed pump maintenance precautions

17 Jun 2019Email

 Boiler feed pumps do not require any lubricant before and during use. However, when reassembling after disassembly, apply proper grease between the center shaft and the copper sleeve. When installing the diaphragm platen, apply a layer of grease on the inside of the outer plate to make it easy to position and seal and disassemble. When the main valve spool valve sleeve is removed, the hardener can not be used to contact the valve plug sleeve, because the valve sleeve is very precise. A small amount of grease is also required when filling the valve and pilot valve to ensure good lubrication. Before the boiler feed pump valve is placed in the valve casing, apply a small amount of grease on the O-ring outside the valve casing, and then press it in by hand. Do not hit it.

Before installing the boiler feed pump, clean all the inner parts (intake part) of the fittings and check whether all the seals are well sealed (mainly refers to the U-ring on the shaft; the O-ring on the thimble; the O-ring on the pilot spool; The inner and outer pressure plates of the diaphragm are compacted and sealed; the inner and outer chambers are compacted and sealed; the ball seat ball valve is sealed; the pilot valve, the air inlet cover and the air valve gasket are sealed), and the grease can be installed while checking the edge. Note that the boiler feed pump air valve gasket is positive and negative, can not be mistaken; the upper pilot valve should be confirmed to be in place to tighten the bolt, otherwise it will damage the thimble; when the upper air valve 4 bolts, pay special attention to the principle of balance, and can not Too tight, otherwise it will damage the valve casing.

 

        Boiler feed pump maintenance tips:

       1 Boiler feed pump does not need to add any lubricant before and during use. However, when reassembling after disassembly, apply proper grease between the center shaft and the copper sleeve. When installing the diaphragm platen, apply a layer of grease on the inside of the outer plate to make it easy to position and seal and disassemble.

       2 When the main valve spool valve sleeve is removed, the hardener can not be used to contact the valve plug sleeve, because the valve sleeve is very precise.

       3 When installing the air valve and the pilot valve, a small amount of grease is also required to ensure good lubrication.

       4 Before installing the pump, wash all the inner parts of the fittings (intake part) and check whether all the seals are well sealed (mainly refers to the U-ring on the shaft; O-ring on the thimble; O-ring on the pilot spool; diaphragm Internal and external pressure plate compaction seal; internal and external cavity compaction seal; ball seat ball valve seal; pilot valve, intake cover, valve gasket seal), can also be installed while checking the grease.

       5 Apply a small amount of grease to the O-ring outside the valve casing before inserting the valve into the valve casing. Then press it in with your bare hands. Do not hit it.

       6 Boiler feed pump valve gasket is positive and negative, can not be wrong; upper pilot valve should be confirmed to be in place to tighten the bolt, otherwise it will damage the thimble; when the upper valve 4 bolts, pay special attention to the principle of balance, and can not Tight, otherwise it will damage the valve casing.

Related Pump Knowledge
More Pump Knowledge
02 May 2025
             With the rapid advancement of industrial development, multistage centrifugal pumps are increasingly wi...
Read more
25 Apr 2025
          There could be many reasons why a horizontal double-suction centrifugal pump fails to draw water. The following are...
Read more
17 Apr 2025
            In the modern industrial equipment system, multistage centrifugal pumps, as core fluid transfer devices, are...
Read more
09 Apr 2025
          In the mining industry, one of the pumps frequently used in mines is the slurry pump. This is a type of pump capabl...
Read more
Related Products
More
Split Case Pump
Split Case Pump
  • Capacity:60-33005m³/h
  • Head:0.95-30.2bar
  • Price:$2200-215000
Double Suction Pump
Double Suction Pump
  • Capacity:60-33005m³/h
  • Head:0.95-30.2bar
  • Price:$2200-215000
Single Stage Chemical Pump
Single Stage Chemical Pump
  • Capacity:5.5-2600m³/h
  • Head:1.6-25bar
  • Price:$4300-37000
End Suction Chemical Pump
End Suction Chemical Pump
  • Capacity:5.5~400m³/h
  • Head:0.42-12.5bar
  • Price:$560-9800
Need More Information?
Contact us for more details about our pump, solutions and services.
Contact ZB
Tel
0086 731 88192011
Email
Chat online
Leave a message
Name*
Tel
Email*
Area
Products
Split Case Pump
Metallurgy
Mining Industry
Urban Water Supply
Petrochemical
Light Industry
Electricity
Chemical Industry
Farmland Irrigation
Other
Provide your comments and questions.