Boiler feed pump disassembly and assembly
Boiler feed pump removal steps:
1. The boiler feed water pump is separated from the motor, and the medium is drained (to prevent the motor and toxic medium from injuring people);
2. Disassemble the boiler pump discharge body;
3. Disassemble the boiler pump stator, if necessary, according to the pump shaft steering shaft to assist;
4. Disassemble the rotor and the intermediate shaft;
5. Disassemble the drive shaft and shaft seal;
6. Take out the boiler pump bearing and positioning sleeve and take it out from the bearing housing;
7. The boiler pump that has not been used for a long time should be treated with anti-rust. The method is to apply non-painted metal surface with anti-rust grease, including the shaft surface, the inner cavity of the packing shell, etc., and lubricate.
When assembling boiler feed pumps, note the following:
1. The boiler pump parts should be carefully cleaned and inspected during assembly, and the damaged parts should be replaced;
2. The correctly installed bearing makes the shaft rotate flexibly and without jamming.
3. Shaft seal installation: When installing the stuffing box, the packing gland pressing bolt should be placed in the housing installation window to facilitate the wrench to adjust the bolt;
4, mechanical seal installation should be careful, the friction end face should be cleaned and coated with grease;
5. When assembling the 20,000-way joint of the drive shaft, check whether the seal ring is damaged or not, and fill the cavity with grease;
6. When installing the stator, apply lubricant to the surface of the rotor and stator cavity to facilitate stator installation;
7. When the body pressure is tightened, the nut should be tightened evenly;
8. When installing and assembling, the coupling installation deviation: △Y≤0.2mm, △α≤30'.

- Capacity:60-33005m³/h
- Head:0.95-30.2bar
- Price:$2200-215000

- Capacity:60-33005m³/h
- Head:0.95-30.2bar
- Price:$2200-215000

- Capacity:5.5-2600m³/h
- Head:1.6-25bar
- Price:$4300-37000

- Capacity:5.5~400m³/h
- Head:0.42-12.5bar
- Price:$560-9800